There is always lots to do. If you can help out or If you are aware of work needing done to improve the river please contact the secretary. Sincere thanks to those who have already helped out improving access this year.
The main work scheduled so far includes:
Replace EAA sign at Coble Point. - complete.(DF)
Sleeper Bridge Beet Factory repair safety rails. – Complete. Thanks TG.
Chop down giant hogweed - Cupar - Tarvit Mill - Complete. Thanks WL.
Cut up last seasons’ fallen trees Lydox
Access South Bank between Lydox Cottages & Edengrove . (Complete Thank you the Guests))
Access to some pools North Bank between Nydie Mill & the Tattie Hole (Thanks Puppet Man)
Plant willow shade Trees to stabilise the banks Tattie Hole
Path South Bank from Nydie Mill – Island. - Complete.Thank you DS.
Island - cut path from top of Island to Tail of the Tattie Hole. (Complete Thanks DS)
Remove fallen tree Dron side at Island
Empty - rubbish bins Dairsie Bridge, (Complete), Edenwood, Pouch, Tattie Hole & Dirdum.(Complete)
Beat Markers, EAA Signage and pool name signs – a winters job
Survey river for Ranuculous weed growth. (Complete DF/NG)
Transplant Ranuculous Trial Aug/Sept 2019 & Spring 2020 (DF/SEPA/SNH)
Identify Redds and gravel condition. URGENT - All report locn to secretary
Locate salmon for TDSFB broodstock – URGENT All August/September.
Gateside Mill weir reduction. (SEPA & TDSFB)- Work Starts November 2019
Remove storm damaged trees ad hoc workparty.
Tractor and winch overhauld & repairs.
Tool store